OffGrid Masterplan

I've been running off-grid solar in Central Queensland long enough to know that a charge controller is not the place to guess. Wrong setting, wrong sequence, or wrong battery type and you can cook a battery bank, pop a controller, or worse. Below is what I actually use as a reference sheet when wiring up or reconfiguring a system. It's written for PWM controllers in the 10A/20A/30A class, which are still the most common units I see in domestic off-grid sheds and small pump setups around here.

Dave Miller, OffGrid Masterplan author

By Dave Miller · off-grid sparky · 22 years wiring solar, batteries and sheds in central QLD

“After blowing a battery bank in a 2018 QLD heatwave, I learned that 14.4V is the absolute ceiling for lithium, not a target.”

Solar Charge Controller Settings: 22 Yrs of QLD Experience

Controller Basics

A PWM solar charge controller sits between the solar panel(s), the battery, and the DC load. It automatically manages and regulates voltage and current from the panel to the battery. It also protects itself and the battery against short-circuit, open-circuit, reverse polarity, and overload conditions, and it prevents power from being drawn backwards from the battery into the panel during shaded or dark conditions. Most consumer units also include a USB port for charging phones or small electronics directly from the controller.

Two important caveats from the field:

Sizing the Controller to the Panels

Match the controller current rating to the panel array, not the battery. The rule of thumb from the manufacturer guidance is that the maximum panel output current should be about 25% less than the controller's maximum input current rating. That headroom prevents the controller from running at its absolute limit on the hottest, brightest Queensland afternoon.

Quick examples:

Voltage Matching: Panels to Battery Bank

Voltage matters as much as current. The panel's open-circuit voltage (Voc) has to land in the right window for the battery bank you're using, and you must not exceed the controller's upper input limit.

Battery bankPanel Voc rangeMax panel Voc
12V18V – 25V25V
24V36V – 50V50V

Going above those maxima will generally kill a PWM controller. If your array runs hotter than those numbers, you need an MPPT unit with appropriate PV input ratings — and you still have to do a low-temperature Voc check, because panel Voc rises as temperature drops, and our clear winter nights in Central Queensland can push strings well above their STC rating.

Maximum Input and Output Power

Power ratings depend on both the controller model and the battery bank voltage. The verified specs for the PWM 10A/20A/30A range are:

ControllerMax PV input @ 12VMax PV input @ 24V
10A120W240W
20A240W480W
30A360W720W

Maximum discharge current to the load is 10A regardless of which model you use — that's 120W with a 12V battery bank and 240W with a 24V bank. Bigger controllers do not give you a bigger load port. If you need more DC load capacity, use a separate switching device rated for the load and let the controller do charge management only.

Connection Sequence (Read This Twice)

This is the part where new installers most often get it wrong. The order is non-negotiable:

1. Battery first. Connect the battery to the controller and confirm the LCD turns on. The battery must have enough voltage (typically 10V or more) to power on the controller and recognise the battery type.

2. Solar panel second. Only after the controller is powered, connect the panel.

3. Load last. Connect the DC load last.

Disconnection is the reverse:

1. Load first.

2. Solar panel second.

3. Battery last.

Keep battery cables as short as possible to minimise voltage drop and losses. Long battery cable runs are a quiet killer of system performance — the controller sees a higher voltage than the battery actually has, and your absorption/float targets end up wrong.

Battery Type and Settings

Battery manufacturer specifications should take precedence over any generic preset in the controller menu. The presets exist as a starting point, not as gospel. If the maker publishes a specific absorption voltage, float voltage, equalisation voltage, and temperature compensation coefficient, use those numbers — not the menu default.

Lead-acid chemistry notes from long practice:

PWM controllers regulate by switching the panel connection on and off, which makes them less effective when the panel's operating voltage is poorly matched to the battery voltage. That's the structural reason MPPT exists.

MPPT vs PWM — When It Matters

MPPT controllers perform DC-DC maximum-power-point tracking and can usefully employ higher-voltage panel arrays than the battery bank. They're not interchangeable with PWM units in every situation. If your array Voc runs higher than the PWM windows shown above, or if you want to harvest more energy from a fixed array, MPPT is the right tool.

Charge Controller Settings: 12V LiFePO4SettingValueBattery TypeLithium / CustomBoost Voltage14.2 VFloat Voltage13.6 VLow Volt Disconnect11.8 VEqualisationOFFAlways match settings to your battery datasheet
Recommended MPPT settings table for a 12V lithium battery

An MPPT controller must still be selected with adequate PV input-voltage and current ratings, including the low-temperature Voc check I mentioned earlier. The two are not a like-for-like swap — they're different controller categories.

Settings, Logs, and Diagnostics

Controller data logs — current, voltage trends, temperature, and fault codes — are useful for diagnosing system performance. If something's not right, the log usually tells you whether the problem is on the panel side, the battery side, or the load side.

Low-voltage load disconnect protects against excessive discharge, but it must be coordinated with the battery, any BMS present, wiring, switching device, and load ratings. Setting the disconnect too low ruins batteries; setting it too high leaves capacity on the table.

Safety — When to Call a Licensed Professional

The safety notes from the manufacturer and from long experience:

Call a licensed professional (electrician) if:

Solar DC voltages above extra-low voltage can be lethal under certain conditions, and Queensland electrical licensing rules apply to fixed wiring work.

FAQ

Q: Can I use a PWM controller with lithium batteries?

A: No — at least not the PWM 10A/20A/30A units described here. They're only suitable for lead-acid (Open, AGM, Gel). For LiFePO4, use a controller that explicitly supports that chemistry and its specific charge profile.

Q: My panel is rated 100W but my controller is 10A — is that fine?

A: Yes. A 6A 100W panel on a 10A controller sits within the rule that maximum panel output current should be about 25% less than the controller's rating.

Q: Why won't the controller turn on?

A: The battery is likely below ~10V. Charge the battery with a separate charger before connecting the controller to the panel. Do not connect a live panel to an unpowered controller — it can permanently damage the unit.

Q: Can I run a 24V load from a 12V system through the load terminals?

A: No. The load terminals supply battery voltage — they don't boost or step down. Match the load to the battery bank, or use an appropriately rated DC-DC converter.

Q: My controller shows USB output — can I leave a phone plugged in overnight?

A: The USB port is powered from the battery through the controller. The controller's low-voltage disconnect should protect the battery, but verify the disconnect setting is correct for your battery type and capacity before relying on it.

Q: How do I know if I need MPPT instead of PWM?

A: If your panel array's open-circuit voltage falls outside the windows in the table above (e.g., grid-tie style panels with Voc above 25V on a 12V bank), or if you want better harvest from a fixed array in our high-irradiance conditions, MPPT is the better match. Make sure the MPPT unit is rated for the array's voltage and current, including a low-temperature Voc check.

Sources

Worth a watch: How to Setup a Solar Charge Controller (menu, battery type & wiring) · Scott's Hobby

It walks through the menu for setting battery type and shows the wiring layout that catches most people out. — Dave Miller

Disclosure: some links in this article are affiliate links. If you buy through them we may earn a small commission at no extra cost to you.

Frequently asked questions

What settings should I use on a solar charge controller for lithium batteries?

I've been running LiFePO4 banks on my own rigs and client jobs for years, and the rules are different to lead-acid. You want a controller that lets you dial in the absorption and float voltages for lithium, and you definitely don't want it forcing an equalisation cycle every time. The article walks through exactly what I set for LiFePO4 versus AGM and flooded banks.

What's the difference between PWM and MPPT solar charge controller settings?

The settings you punch in are mostly the same — it's the controller doing different work behind the scenes. PWM basically chokes the panels back to battery voltage, while MPPT can pull more power out of them, especially in the heat we cop in Queensland. I've got a full section in the article on tuning each type properly.

Do I need to turn on temperature compensation on my solar charge controller?

In central Queensland, absolutely — battery temps swing hard between a cold winter night and a tin shed roof at lunchtime. Without temp comp you'll overcharge when it's hot and undercharge when it's cold. I run a sensor on every bank and it has saved me plenty of grief over the years.

What should I check on my solar charge controller each morning?

I make a habit of glancing at the data log first thing — looking at what came in the day before, the battery voltage trend, and any fault codes. The article covers what to look for in those logs so you can spot trouble before it kills a battery. Takes a minute and has saved my bacon more than once.

When the work hits safety limits – bring in a licensed sparky.

While many off-grid projects are achievable as DIY, certain situations require licensed professionals:

Always check local regulations and obtain necessary permits before commencing work.